Executive summary
A short plain-English introduction to the proposal and the main reasons for concern.
Official portal document 4793899
Read PDFPlanning application UTT/26/1635/OP
Read the Save Church End documents submitted to Uttlesford District Council, including the latest representations on Church End Bridge and construction routing, healthcare capacity, omitted landscape viewpoints and other infrastructure.
Verified public record
This library brings together portal-published documents and further representations submitted by email. Each entry identifies the publication or submission evidence currently verified. An email submission does not itself confirm publication on the portal.
Postal addresses have been removed from website copies for privacy. The planning arguments have not been changed. The Council's portal remains the authoritative record of what it has formally published.
The main case
A short plain-English introduction to the proposal and the main reasons for concern.
Official portal document 4793899
Read PDFThe main objection written so residents and decision-makers can follow the complete case clearly.
Official portal document 4793895
Read PDFThe detailed evidence-led planning case, including transport, drainage, services, heritage and ecology.
Official portal document 4793906
Read PDFA focused review of the proposal against the relevant National Planning Policy Framework tests.
Official portal document 4793907
Read PDFWhy the increase from the allocated 715 homes to 850 must be tested against the adopted Local Plan.
Official portal document 4796160
Read PDFLocal visual evidence covering flooding, drainage, otters beside the River Chelmer and the landscape and heritage setting seen from the Recreation Ground, Beaumont Hill and the path to Merks Hill.
Official portal document 4793910
Read PDFFurther evidence
Further clean-water evidence on pressure, unresolved residual headroom and reinforcement options. Archive of the submitted email; the Affinity response was supplied separately to Planning.
Email submission verified in local Outlook · 21 October 2026
Read submissionLoss of dedicated youth-centre capacity, current and cumulative demand, recreation-ground delivery and the need for funded operational services rather than buildings alone.
Email submission verified in local Outlook · 19 October 2026
Read submissionOur submitted response concerning outstanding ECC information, the uplift from 715 to 850 homes and the incomplete mitigation and contribution schedule. Historical position at the submission date.
Email submission verified in local Outlook · 29 September 2026
Read submissionThe original policing representation, with a separate note about the subsequent internal review. Historic combined response figures are not presented as current annual performance.
Email submission verified in local Outlook · 18 September 2026
Read submissionUpdates our September healthcare representation with the MP's account of the ICB's funding priorities, the latest contribution records and five specific requests for funded, operational healthcare provision and enforceable delivery safeguards.
Submitted by email on 15 November 2026 · portal publication not yet verified
Read submissionThe Council's FOI response and internal review have not demonstrated that leisure capacity has kept pace with growth. Requests a cumulative assessment and secured delivery of any necessary additional provision.
Submitted by email on 29 October 2026 · awaiting Council publication
Read submissionWhy the bridge's 7.5-tonne legal restriction, assessed 18-tonne current capacity and need for strengthening before 40/44-tonne loading require an enforceable construction route before determination.
Submitted by email on 17 October 2026 · awaiting Council publication
Read PDFThe unresolved cumulative, hospital, ambulance and community-health capacity evidence, operational delivery arrangements and healthcare-contribution accounting.
Official portal documents 4817231 and 4817229
Read PDFWhy the review must assess the connected sequence of elevated public views from Beaumont Hill, The Causeway, Lime Tree Hill and the public footpath towards St Mary's Church, the churchyard and River Chelmer.
Submitted by email on 12 September 2026 · awaiting Council publication
Read PDFWhy the Council should verify sales, occupation, affordability and delivery on existing Great Dunmow developments before permitting another 850-home, car-dependent scheme.
Official portal document 4810325
Read PDFWhy Anglian Water's late admission that Great Dunmow Water Recycling Centre lacks capacity cannot be resolved by its suggested condition, with the constrained sewer route, environmental limits and unresolved SuDS responsibility also examined.
Official portal document 4800966
Read PDFWhy a financial contribution does not demonstrate that Great Dunmow's existing on-call fire-service capacity and emergency attendance problems will be resolved.
Official portal document 4800970
Read PDFEvidence concerning a very rare Annex II barbastelle bat, nationally important activity and the need to assess the connected boundary, woodland, hedgerows and river corridor across adjoining sites.
Submitted by email on 23 August 2026 · awaiting Council publication
Read PDFThe applicant's own figures, provisional UK Power Networks offer, competing connection demand and unresolved reinforcement do not demonstrate a secured supply for the all-electric development.
Official portal document 4799788
Read PDFA document-by-document audit of the applicant's 70 original submission documents, identifying 16 material omissions, contradictions and unresolved evidence requirements.
Submitted by email on 21 August 2026 · awaiting Council publication
Read PDFEvidence about the combined effect of existing developments discharging towards the River Chelmer.
Official portal document 4795158
Read PDFQuestions raised by a reported untreated sewage discharge during officially declared drought conditions.
Official portal document 4797613
Read PDFTwo separate infrastructure issues: drinking-water supply and pressure, and wastewater treatment capacity.
Official portal document 4797698
Read PDFHow the revised national decision-making policies reinforce the unresolved objections on transport, services, flooding, infrastructure, landscape, heritage and ecology.
Official portal document 4799187
Read PDF